Project: MattJ   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Matt Jakus   -  
Project:   The Airplane Factory - Sling TSi   -   VIEW REPORTS
Total Hours:1190.7
Start/Last Date:Dec 01, 2019 - Jan 29, 2023
Engine:Rotax 915is
Panel:Garmin 3X
 
Friendly URL: https://eaabuilderslog.org?s=MattJ

Home or Last Project Picture

Jan 30, 2021     Fabricate wire shelves - (4 hours)       Category: Fuselage
The center console is where all things go forward and aft. Brake lines, fuel lines, rudder cables, pitot-static lines, and wiring.The channel soon gets stuffed with these items and it can be a challenge to keeps things from getting in the way of other things. I saw another builder had the observation that there is a lot of unused vertical space in the center console and place two small shelves to run wiring bundles.

I only learned a few things in Engineering school.:

1) I can't study after a kegger..
2) Don't reinvent the wheel
3) If someone has a good idea, use it

So I am fabricating these same shelves to make using the center console easier for running the wire bundles. Here is 1 of 2 I made.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.